Barb's Kitchen
Wednesday, July 05, 2006
Pictures
The kitchen cabinets, sink, and most appliances have been installed. The walls will need to be patched where the elctrician has left holes.
Still to be done, the ovens, the floor, and tile. It is really starting to look good.
posted by The Evans Family at
7:18 PM
0 Comments:
Post a Comment
<< Home
Contributors
Nancy
The Evans Family
Previous Posts
Granite
Electrical
Ceiling Fan
Water Filtration
Hardware
Detailed Drawings
Cabinentry Style
Jenn air Pro Style Dishwasher
Jenn Air Refrigerator
Jenn Air Pro Style 27" ovens
0 Comments:
Post a Comment
<< Home