Barb's Kitchen
Wednesday, July 05, 2006
Pictures
The kitchen cabinets, sink, and most appliances have been installed. The walls will need to be patched where the elctrician has left holes.
Still to be done, the ovens, the floor, and tile. It is really starting to look good.
posted by The Evans Family at
7:18 PM
0 comments
Contributors
Nancy
The Evans Family
Previous Posts
Wall of Photos
Bedroom Wall
Kitchen Update
Pictures
Granite
Electrical
Ceiling Fan
Water Filtration
Hardware
Detailed Drawings
Archives
January 2005
March 2006
May 2006
July 2006
October 2012